before and framing

Once the old kitchen was packed up, Jeremy and Doug made quick work of removing any sign it ever existed. Temporary walls were then constructed to support the 2nd floor while we removed the only bearing wall and replaced it with a laminated beam. This was necessary to open up the floor plan and make for a much better flow through the new spaces.

 

This entry was posted in Current Projects, Tall Oaks kitchen renovation (db). Bookmark the permalink.

Comments are closed.