walls and floor

Jeremy, Doug, and Andrew were on hand to hang the sheetrock with Andrew opting to handle the taping and finishing himself. Brinkley’s painting followed close behind to spray a primer coat on everything and a finish coat on the ceiling. Don Thomas, of Thomas Installations, was then selected to install the Schluter Ditra-heat tile underlayment and heating system. Once the heating cable was in place and tested, Don then began setting the tile in a modified pinwheel pattern. Everyone loves the results.

 