Skip to content
PROJECTS
GALLERY
DESIGN-BUILD
INFORMATION
ACCOLADES
OWNER BIO
CONTACT
←
before and framing
Jeremy finishes the notch cuts in the overhead floor system to let-in the new support beam
By
awch
|
Published
February 17, 2015
|
Full size is
638 × 960
pixels
Jeremy works to make sure the existing ceiling is loose from the bearing wall
Jeremy and Doug installing the 3rd lamination of the support beam
Bookmark the
permalink
.
Comments are closed.